Thursday, November 26, 2009


Work continues on the interior, with multiple levels now in place for the framing of the Altar risers. The new layout will have the altar one step lower than the previous layout and it will be situated closer to the pews. This will leave room to the front (below the Crucifix) for the repostitioning of the Tabernacle. It will stand atop the highest step at the base of the Crucufix. Other work moving along inside is the ductwork for the new air conditioning and heating system as can be seen in the new pictures in the slideshow. Thanks for following along.

Thursday, November 19, 2009

Sanctuary Platform



The inside of the Church is undergoing many changes that are unseen by most of us. Clearly this will be a very different look once we get to worship inside our 'not so usual' space. As we can see from the outside (new photos in slideshow), much progress is being made to add on to the building and create new space. On the inside, walls are now in place and sanded, awaiting final finishing. And speaking of finishing, the ceiling has been sanded and re-coated and looks just great. The plumbing has still to be boxed in, but the ceiling and support beams have a fresh new coat of urethane on them. As you can see from this photo, the main Sanctuary is now the focus of attention as the new altar platform is being constructed. Leveling such a large area is painstaking work, but the crew was working to get it just right! Thanks for following along. Ps 62:1 My soul rests in the Lord.