Work continues on the interior, with multiple levels now in place for the framing of the Altar risers. The new layout will have the altar one step lower than the previous layout and it will be situated closer to the pews. This will leave room to the front (below the Crucifix) for the repostitioning of the Tabernacle. It will stand atop the highest step at the base of the Crucufix. Other work moving along inside is the ductwork for the new air conditioning and heating system as can be seen in the new pictures in the slideshow. Thanks for following along.