June 4th and where to begin? Another very energetic day on the site this morning. Right at the entrance, with earth moving equipment doing what they do to make way for the parking lot. Next up were the guys laying the base for the pavers. As I stepped into the Sanctuary, a lot of the plastic has been removed from items like the Altar and Ambo, so new photos of them... Final pieces of the new windows going in on the west wall. The new organ is installed and unwrapped. Don't know when the sound checks are scheduled for! Woodwork for the trin in the choir loft is going on, with a new railing added to the front of the loft.Tile work in the entrance, stucco work out front and pavers going down. Enjoy the photos. Thanks for following along!