Sunday, July 11, 2010
Final Inspection
The last required inspection is scheduled for Monday (tomorrow)! Last item to go in is the special flooring in the entrance, which allows for snow removal and rain water drainage before entering the main gathering area. This should be installed Monday morning. Also to be installed is the carpeting in the Upper Room. Remaining work for the windows and columns, then a few days of touch up and such. Myron (UDC) tells me we will be worshipping in our 'NEW' Church next weekend. Just in time for Bishop Bootkoski to join us to Bless our new Sanctuary and Altar on Aug.1st. Appropriate too, since the Feast of St. John Vianney is only a few days hence, on August the 4th. Thanks for following along!
Subscribe to:
Post Comments (Atom)

I arrived from out of town ( I was a parish member from 1977-1990 ) and I was upset to find that mass was still be celebrated in the cafeteria downstairs - when I asked others about the website, they stated "the church was ready however the website had not been updated" - when is the church going to be ready???
ReplyDelete